Recently in Permeables

Staying Power of Pavers

Spring 2013

A 33-year-old Paver installation demonstrates outstanding durability

by Peter Fretty

Posted in Interlock-Design | Tagged , , | Leave a comment

LEED v4 at the Door

Spring 2013

With the upcoming release of LEED v4, some important changes are in store

by David R. Smith

Posted in Interlock-Design | Tagged , , | Leave a comment

Great Expectations

Winter 2013

Creating the new normal, paver by paver

By David Smith

Posted in Interlock-Design | Tagged , , | Leave a comment

MEMORIAL INSPIRES PAVER DESIGN AESTHETIC

Winter 2013

Memorial presented unique design challenges

By Elizabeth Millard

Posted in Interlock-Design | Tagged , , | Leave a comment

A Contractor’s Project Perspective

Winter 2013

contractor recounts challenges

 

Posted in Interlock-Design | Tagged , , | Leave a comment

Remaking a City

Winter 2013

PROJECT 180 TRANSFORMS OKLAHOMA CITY AND PAVERS PLAY A MAJOR ROLE

By Elizabeth Millard

Posted in Interlock-Design | Tagged , , | Leave a comment

ICP for 75th Anniversary

Winter 2013

The Golden Gate Bridge gets a gift of concrete pavers

Posted in Interlock-Design | Tagged , , | Leave a comment

Red Pill or Blue Pill

Fall 2012

Dual Realities Exist in the Matrix of Stormwater Management

Interlockutor

Posted in Interlock-Design | Tagged , , | Leave a comment

Permeable Design Pro

Web Exclusive

Permeable Pavement Design Using Permeable Design Pro Software

Posted in News | Tagged , , | Leave a comment

Win-Win Situation

Web Exclusive

Congressman LoBiondo Participates in Permeable Pavement Demonstration with EP Henry and ICPI

Posted in News | Tagged , , | Leave a comment